In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST’s exciting scientific potential.
Conference Presentation
© (2018) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Randy A. Kimble, Lee D. Feinberg, Mark F. Voyton, Juli A. Lander, J. Scott Knight, Mark Waldman, Tony Whitman, M. Begoña Vila Costas, Carl A. Reis, and Kan Yang "James Webb Space Telescope (JWST) optical telescope element and integrated science instrument module (OTIS) cryogenic test program and results", Proc. SPIE 10698, Space Telescopes and Instrumentation 2018: Optical, Infrared, and Millimeter Wave, 1069805 (24 July 2018); https://doi.org/10.1117/12.2309664
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

James Webb Space Telescope

Optical testing

Adaptive optics

Image segmentation

Space telescopes

Telescopes

RELATED CONTENT


Back to Top