6 July 2018 Getting ready for serial production of the segmented 39-meter ELT primary: status, challenges and strategies
M. Dimmler, P. Barriga, M. Cayrel, F. Derie, A. Foerster, F. Gonte, J. C. Gonzalez, L. Jochum, N. Kornweibel, S. Leveque, C. Lucuix, L. Pettazzi
Author Affiliations +
Abstract
In the last years the ELT Program has entered construction phase. For the large 39 meter segmented primary mirror unit with thousands of components this means that the start of the series production is getting closer, where the final hardware will be built. The M1 Unit has been broken down in products and a procurement strategy has been developed. Most of the major design decisions have been frozen and component specifications have been settled. Most of the suppliers have already been selected and contracts have been kicked off. This paper describes the ELT M1 Unit product breakdown and the procurement baseline for each product and its status. The production contracts would not have been possible without intense prototyping and verification strategies independent of the component contracts. Therefore, the paper also takes a look back at the prototypes and de-risking strategies, which had been put in place to prepare for construction phase. Ramping up the construction contracts involves finishing design details for some products while setting up production lines for others. This requires controlling interfaces and cross-contract dependencies, a challenge described in this paper. For continuous de-risking similar verification strategies than during the design phase are planned in parallel with the production until telescope assembly, integration and verification. These measures will increase confidence in the design choices, allow early discovery of remaining design flaws and provide training means for assembly and integration long time before all components of the ELT M1 are complete and being installed on Cerro Armazones in Chile. The paper will also give an outlook on these running and planned activities.
© (2018) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
M. Dimmler, P. Barriga, M. Cayrel, F. Derie, A. Foerster, F. Gonte, J. C. Gonzalez, L. Jochum, N. Kornweibel, S. Leveque, C. Lucuix, and L. Pettazzi "Getting ready for serial production of the segmented 39-meter ELT primary: status, challenges and strategies", Proc. SPIE 10700, Ground-based and Airborne Telescopes VII, 1070043 (6 July 2018); https://doi.org/10.1117/12.2312073
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Manufacturing

Prototyping

Sensors

Polishing

Mirrors

Control systems

Electronics

RELATED CONTENT

MMT adaptive secondary mirror prototype performance
Proceedings of SPIE (March 21 1997)
Adaptive secondary mirrors for the Large Binocular Telescope
Proceedings of SPIE (February 07 2003)
REOSC starts to work on the first VLT mirror
Proceedings of SPIE (June 01 1994)
Control electronics for an adaptive secondary mirror
Proceedings of SPIE (September 11 1998)
Giant segmented adaptive mirrors: progress report
Proceedings of SPIE (January 30 2003)
Design and performance of a small two axis high bandwidth...
Proceedings of SPIE (February 01 1991)

Back to Top