25 August 1998 Commissioning of the Italian National Telescope Galileo
Author Affiliations +
Abstract
The commissioning phase of the Telescopio Nazionale Galileo is started during the first half of 97. Large parts of the drive, the optical and the control system have been mounted at the telescope in site (LaPalma, Canary Islands). The telescope is expected to be ready for the technical first- light during February - March 98 while the instrumentation first-light is expected for mid 98. On this review of the commissioning operations we will describe the problems encountered and the results achieved integrating the main telescope subsystems.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Fabio Bortoletto, Carlotta Bonoli, Maurizio D'Alessandro, Roberto Ragazzoni, Paolo Conconi, Dario Mancini, and Mauro Pucillo "Commissioning of the Italian National Telescope Galileo", Proc. SPIE 3352, Advanced Technology Optical/IR Telescopes VI, (25 August 1998); https://doi.org/10.1117/12.319258
Lens.org Logo
CITATIONS
Cited by 5 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Computer programming

Control systems

Optical alignment

Active optics

Cameras

Mirrors

RELATED CONTENT

Prototyping the GMT telescope metrology system on LBT
Proceedings of SPIE (July 10 2018)
DAG 4m telescope: assembly, integration and testing
Proceedings of SPIE (July 06 2018)
The GTC project: under commissioning
Proceedings of SPIE (July 10 2008)
Active optics experiments with a 62-cm thin mirror
Proceedings of SPIE (July 01 1990)
Commissioning the VST Telescope Control Software
Proceedings of SPIE (September 24 2012)

Back to Top