25 August 1998 Magellan 6.5-m telescopes project: status report
Author Affiliations +
Abstract
Construction of the Magellan Project 6.5 meter telescopes is in progress. The enclosure for the first telescope is complete along with the auxiliary building that will house the coatings plant. The mount for the first telescope was shipped to Las Campanas Observatory in October 1997. Currently the telescope is being installed in its enclosure and will be cabled up and under test in the first half of 1998. Primary mirror #1 is being polished by the University of Arizona and will tested on its supports in the telescope cell prior to shipping in Chile in early 1999. The work of re-building the oven for casting the second Magellan mirror has just started. The development of the first suite of science instruments that will include visible band and 1 - 2.5 micron infrared multi-object spectrometers is underway. A two channel Echelle spectrometer is also planned. This paper summarizes the progress to date.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Matthew Johns "Magellan 6.5-m telescopes project: status report", Proc. SPIE 3352, Advanced Technology Optical/IR Telescopes VI, (25 August 1998); https://doi.org/10.1117/12.319266
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Mirrors

Polishing

Spectrographs

Cameras

Imaging spectroscopy

Observatories

RELATED CONTENT

Status and perspective of Subaru Telescope Project
Proceedings of SPIE (March 21 1997)
COHSI: the Cambridge OH Suppression Instrument
Proceedings of SPIE (March 21 1997)
Science with IMACS on Magellan
Proceedings of SPIE (February 13 2003)

Back to Top