12 October 2004 James Webb Space Telescope (JWST) Optical Telescope Element (OTE) development status
Author Affiliations +
Abstract
The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK), and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Lee D. Feinberg "James Webb Space Telescope (JWST) Optical Telescope Element (OTE) development status", Proc. SPIE 5487, Optical, Infrared, and Millimeter Space Telescopes, (12 October 2004); https://doi.org/10.1117/12.562564
Lens.org Logo
CITATIONS
Cited by 5 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

James Webb Space Telescope

Space telescopes

Telescopes

Cryogenics

Wavefront sensors

Beryllium

Back to Top