17 September 2012 Commissioning results from the Large Binocular Telescope
Author Affiliations +
Abstract
Commissioning of a telescope facility such as the Large Binocular Telescope presents us with unprecedented challenges. The logistical and managerial balance act of scheduling commissioning of telescope, adaptive optics and twelve focal stations with subsequent commissioning of the instruments that populate the focal stations, while still providing for adequate science opportunity with already operational instruments is an equation that is problematic to solve in a way that meets the interests of all stakeholders. This paper presents strategies and priorities applied at the LBTO, and status of telescope commissioning programs. We provide a summary of telescope commissioning results, including a discussion about specific efforts to improve performance of the LBT.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Joar G. Brynnel, Norman J. Cushing, Richard F. Green, John M. Hill, Douglas L. Miller, Andrew Rakich, and Konstantina Boutsia "Commissioning results from the Large Binocular Telescope", Proc. SPIE 8444, Ground-based and Airborne Telescopes IV, 84441D (17 September 2012); https://doi.org/10.1117/12.927291
Lens.org Logo
CITATIONS
Cited by 5 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Adaptive optics

Collimation

Mirrors

Stars

Cameras

Observatories

RELATED CONTENT

The Large Binocular Telescope: binocular all the time
Proceedings of SPIE (July 10 2014)
Telescope performance at the Large Binocular Telescope
Proceedings of SPIE (July 27 2016)
Commissioning results from the Large Binocular Telescope
Proceedings of SPIE (August 04 2010)
The Large Binocular Telescope
Proceedings of SPIE (July 10 2008)
The Large Binocular Telescope
Proceedings of SPIE (September 17 2012)

Back to Top