The M2 secondary mirror of the Vera C. Rubin Observatory, scheduled to be commissioned on-sky in 2024, will be the first active secondary mirror of 3.5m diameter in operation. Its substantial dimensions and advanced functionalities place it in league with the secondary mirrors of the upcoming 30m class telescopes. Characterizing its performance serves as a critical step towards comprehending and controlling the optics of the next generation of Extremely Large Telescopes (ELTs). This study focuses on testing and validating the M2 cell in the Observatory’s integration hall and at the Telescope Mount Assembly (TMA). We also report on the integration steps of the M2 cell onto the TMA itself, including installing the light baffle. During the testing campaign, the M2 cell is equipped with an aluminum mirror surrogate for safety reasons regarding the glass mirror. To ensure integrity when the thin glass mirror (10cm) is installed onto the telescope, the M2 support system must be actively controlled during any M2 cell movement. This prompted the development of a dedicated control system to enable closed loop mode for transporting the M2 cell with the glass mirror from the integration hall to the telescope. The tests in the integration hall were conducted with the M2 cell mounted on a rotating cart, allowing different orientations with respect to gravity as it will experience on the telescope. Upon reaching the telescope, static and dynamic tests are conducted at progressively higher telescope performance, increasing slewing speed, acceleration, and jerk. A significant novelty introduced by Rubin to astronomical instrumentation is the Verification & Validation architecture as part of the model-based Systems Engineering approach where requirements, test procedures and executions are merged into an interlaced and dynamic flow. This report presents the experimental results from the distinct test campaigns covering a wide range of M2 cell functionalities. These include characterization of actuator behavior in terms of maximum stroke and force limits, evaluation of closed-loop (active) and open-loop (passive) support system operation for the M2, system settling time and Force Balance response to different slewing speeds of the telescope.
The Vera C. Rubin Observatory is an integrated survey system, currently under construction in Chile, to accomplish a 10-year optical survey of the southern sky. The 8.4-meter Simonyi Survey Telescope mount is nearing completion and undergoing final verification and performance testing. Since the system is optimized for etendue, the telescope mount slewing performance is particularly critical to overall survey efficiency. For example, this high performance mount is required to slew 3.5 degrees, on the sky, and settle in a 4-second period. Here an account of the mount subsystem is presented and selected dynamic performance results from on-site testing are described.
The Simonyi Survey Telescope (formerly known as the Large Synoptic Survey Telescope) of the Rubin Observatory is an 8.4m telescope now in construction on Cerro Pachón, in Chile. This telescope has been designed to conduct a 10 years’ survey of the sky in which it will map the entire night sky every three nights. The Mirror Cell Assembly system is a 9x9m steel structure that provides positioning, support, figure correction and temperature control to the primary and tertiary mirror. It is composed of two main systems, the Support System and the Thermal Control System. The Support System provides positioning, support and figure control of the mirror as well as dynamic forces compensation. The Thermal Control System will control the bulk temperature and temperature variations throughout the mirror. The temperature variations produce thermal distortions of the mirror which produce image degrading distortion of the optical surface. Variations between the bulk temperature and the ambient degrade local seeing and can produce condensation. The mirror cell assembly was designed and build in Tucson, Arizona by the LSST engineering team, and was tested, to confirm correct integration, at the Richard F Caris Mirror Lab to confirm the optical performance of the system using the real glass mirror. After successful testing, the mirror cell assembly was disassembled, packed and shipped to the Cerro Pachón summit in Chile where it was integrated with the surrogate mirror, and installed on the telescope mount assembly (TMA) for system performance test. Once system performance test concluded, the mirror cell was transported to the maintenance level to remove the metal surrogate mirror, install the glass and coat. After coating the mirror, the mirror cell assembly will be integrated with the telescope mount assembly to conduct final testing and verification.
The Vera C. Rubin Observatory is an astronomical survey facility nearing completion in Chile. Its mission is to accomplish the 10-year Legacy Survey of space and Time (LSST) survey - a 6-color optical imaging survey of the southern sky. The science mission for the LSST resulted in demanding requirements for optical performance and system dynamics. Producing a Telescope and an Observatory meeting these requirements resulted in multiple technical challenges which were encountered and resolved during the design and construction of the project. Resolving these challenges has impacted the assembly and integration of the overall system. Analyses were performed and solutions were developed. This paper provides a general overview of these challenges and highlights some specific examples where resolutions were found and implemented.
KEYWORDS: Observatories, Control systems, Distributed computing, Telecommunications, Telescopes, Reliability, Java, Control systems design, Visualization
Once in operation, the Vera C. Rubin Observatory will execute a ten-year-long survey of the Southern sky known as the Legacy Survey of Space and Time (LSST). The Rubin Observatory Control System (Rubin-OCS) is a distributed system with each component in charge of a particular sub-system e.g.; the mount, the M1M3 mirror support system, etc. Each component is designed as an independent part of the system, and they must work together during operations. Communication between the components is done by means of a software middleware. The software middleware is the backbone of the system, allowing components to communicate with each other in a seamless way. The highly distributed nature of the Rubin-OCS places tight constraints in terms of latency, availability, and reliability for the middleware. The baseline implementation of the Rubin-OCS adopts the Data Distribution Service (DDS) technology for the middleware. In the Rubin-OCS, the middleware is encapsulated with a layer of abstraction known as the Service Abstraction Layer (SAL), which currently uses the ADLink-OpenSpliceDDS implementation of the Data Distribution Service (DDS) message passing system. Recently we performed a study of using Apache Kafka to replace DDS as the middleware technology for the Rubin-OCS. This study was motivated by the middleware-related challenges we faced while integrating the system as well as the recent announcements indicating that the adopted library may be deprecated during the lifespan of the project. The study involved throughput and latency studies and a proof of concept of our core libraries. Overall Kafka proved to be a suitable replacement for DDS.
In the last couple of years, the Rubin telescope and site subsystem has made tremendous progress and overcome a few challenges. The insulated cladding on the dome is done and work is now focused on finishing the louvers, weatherproof cladding, interior work, light baffles, and the final fabrications. This has been done concurrently with the installation of the telescope mount, now mostly complete and approaching the beginning of functional testing in September-October, 2022. While work is being done on these two major subsystems, other major components and systems are being integrated and tested in a system spread configuration: M1M3 & M2 mirrors, the camera hexapod/rotator and the control software, including elements of the active optics control and the commissioning camera. Finally, the calibration system - an important contributor to achieving the exquisite photometry required by the Legacy Survey of Space and Time (LSST) - is being finalized.
The construction of the Vera C. Rubin Observatory is well underway, and when completed the telescope will carry out a precision photometric survey, scanning the entire sky visible from Chile every three days. The photometric performance of the survey is expected to be dominated by systematics; therefore, multiple calibration systems have been designed to measure, characterize and compensate for these effects, including a dedicated telescope and instrument to measure variations in the atmospheric transmission over the LSST bandpasses. Now undergoing commissioning, the Auxiliary Telescope system is serving as a pathfinder for the development of the Rubin Control systems. This paper presents the current commissioning status of the telescope and control software, and discusses the lessons learned which are applicable to other observatories.
The Vera C. Rubin Observatory is currently under construction on Cerro Pachón, in Chile. It was designed to conduct a 10-year multi-band survey of the southern sky with frequent re-visits (with both an intra- and extra-night cadence) to identify transient and moving objects. The mirror cell assembly was designed in Tucson, Arizona by the Rubin Observatory engineering department, and was tested twice in Tucson. The first testing campaign was performed at CAID industries, where the mirror cell was fabricated, using a steel mirror surrogate that has the same geometry and mass of the glass mirror2,4. The glass mirror is a single monolith that contains both the primary and tertiary mirrors on a single substrate. The testing results confirmed that the mirror support system was performing within the design specifications, and that it was safe to install the glass mirror on the cell. The second test campaign was performed at the Richard F. Caris Mirror Lab of the University of Arizona using the actual glass mirror16. This test campaign was performed under the test tower, which contains a vibration insensitive interferometer to measure mirror figure. This confirmed the mirror support system could achieve proper optical surface figure control for both primary and tertiary mirrors. After successful test campaigns at CAID, and the mirror Lab, the mirror cell assembly was disassembled, packed and shipped to the Rubin Observatory site at the Cerro Pachón summit in Chile. Upon arrival, the mirror cell has been integrated with the mirror surrogate once again to perform the third test campaign that confirmed the system has arrived safe and operational to the summit. This integrated system will be tested on the telescope mount assembly to verify that it still meets it requirements under the effects of variations in gravitational orientation, and dynamic (slewing) loads.
The Vera C. Rubin Observatory (Rubin Obs) (formerly Large Synoptic Survey Telescope - LSST) is an 8.4-m telescope, now under construction in Chile. In the last couple of years, the telescope has achieved tremendous progress, though like many other projects, progress has been curtailed for over six months due to the worldwide pandemic. This paper provides the high-level status of each of the telescope's subsystem. The summit facility (Cerro Pachon) and base facility (La Serena) have been substantially completed. The dome is expected to be finished by October of 2021, which will also allow the completion of integration and testing of the Telescope Mount Assembly (TMA). The integration and verification of the TMA is planned to be completed by the end of 2021. The two mirror systems, M1M3 and M2, have been fully tested under interferometers, showing they both satisfy their performance requirement, and both have been received at the summit facility. The M2 mirror has been successfully coated with protected aluminum, which is the first scientific coating produced by the new Rubin coating plant. The M1M3 mirror is planned to be coated with the same plant at the beginning of 2022. The auxiliary telescope and its principal spectrograph instrument, which will allow for real-time atmospheric characterization, has been commissioned. The Rubin environment awareness system (EAS), which includes the DIMM, weather station, all-sky camera, and facility environmental control, is operational. Significant progress has been made on the software for all of the above-mentioned subsystems, as well as the comprehensive telescope control system and the telescope operator interfaces.
The Large Synoptic Survey Telescope (LSST) primary/tertiary mirror is an 8.4-meter cast borosilicate monolith. The hardpoints form a hexapod that is used to define the location of the M1M3 relative to the mirror cell, as the pneumatic figure actuators, which support the mass of the M1M3 during operation, are unable to define position. The hardpoints must have high stiffness, precise displacement control, and features to limit loads in all six degrees of freedom in order to protect the mirror. Assembly of the hardpoints and verification of the hardpoints and their requirements was undertaken in the summer and fall of 2017.
The Large Synoptic Survey Telescope (LSST) primary/tertiary (M1M3) mirror cell is a 25-ton, 9-meter x 9-meter x 2- meter steel weldment that supports the 19-ton borosilicate M1M3 monolith mirror on the telescope and acts as the lower vessel of the coating chamber when optically coating the mirror surfaces. The M1M3 telescope mirror cell contract was awarded to CAID Industries, Inc., of Tucson, Arizona in October 2015. After the mirror cell final acceptance in October 2017, the integration of the mirror support system started. The M1M3 cell assembly with the surrogate mirror will take place in a dedicated controlled-environment area at CAID Industries. All components of the mirror support system that were developed and tested by the LSST Telescope and Site M1M3 team at the NOAO offices in Tucson have been moved to CAID premises and have been integrated into the cell by a team of LSST, CAID and Richard F. Caris Mirror lab personnel. After completion of the cell integration and its assembly with the surrogate, a test phase that includes zenith and offzenith testing for the mirror support system will be carried by the LSST team. These tests aim to verify that the active support system components, mirror control, and software are performing as expected and the mirror support system is safe for the next step, the M1M3 cell to borosilicate glass assembly and tests at the RFC Mirror Lab of the University of Arizona.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.