18 February 2022 Research on construction schedule prediction method of power transmission and transformation project based on support vector machine
Qin Liu, Bingqian Chen, Yan Yan
Author Affiliations +
Proceedings Volume 12162, International Conference on High Performance Computing and Communication (HPCCE 2021); 121620Q (2022) https://doi.org/10.1117/12.2628173
Event: 2021 International Conference on High Performance Computing and Communication, 2021, Guangzhou, China
Abstract
Electric energy is one of the important boosting forces for the progress of social and economic development and the improvement of people's quality of life. As the basic carrier of electric energy, the transmission and transformation project can be completed and put into operation on schedule, which is of great significance for ensuring the safe and effective supply of electric energy. Therefore, based on the analysis of construction schedule management problems and influencing factors of power transmission and transformation projects, this paper constructs a support vector machine-based construction schedule early warning method model, and verifies the validity of the model based on actual engineering cases. This model can provide a reference for improving the management level of the construction schedule of power transmission and transformation projects.
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Qin Liu, Bingqian Chen, and Yan Yan "Research on construction schedule prediction method of power transmission and transformation project based on support vector machine", Proc. SPIE 12162, International Conference on High Performance Computing and Communication (HPCCE 2021), 121620Q (18 February 2022); https://doi.org/10.1117/12.2628173
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Analytical research

Factor analysis

Research management

Statistical modeling

Data modeling

Error analysis

Statistical analysis

Back to Top